会员登录
请登录您的生意号,获取电子名片。便于转发分享!
取消
Tianda News
会员登录
请登录您的生意号,获取电子名片。便于转发分享!
取消
Concentrate drying line
Release Time:2021-11-17
南宫棋牌app下载

Technology introduction

In the production process of oxidized pellets, the quality stability of iron concentrate determines the quality of raw pellets and affects the quality of pellets to a great extent, so it is very important to control the fluctuation of iron concentrate moisture. When the iron concentrate moisture is higher than the production requirements, the concentrate drying system must be set up. When the iron concentrate moisture is higher than the production requirements, the concentrate drying system must be set up.
Our company has undertaken the hot blast furnace general contracting projects for supporting domestic night team type pelletizing projects such as Wuhan Iron and Steel (5 million tons), Baosteel Zhanjiang Longteng Logistics (5 million tons), Jiangdu Taifu (3 million tons) X2 and Indian BMM (1.2 million tons) X2.

Performance and parameters

Processing power t/h Filling water content % Discharge water content% Dryer specifications m Installed powerkw Notes
10~15t/h <12 <7 Φ2.2×14m 55 Drying material moisture and specific gravity is different, parameters for reference only
20~25t/h <12 <7 Φ2.4×18m 75
30~40t/h <12 <7 Φ3×20m 132
50~60t/h <12 <7 Φ3.6×25m 315
70~80t/h <12 <7 Φ4.3×28m 800
南宫棋牌app下载

Home

南宫棋牌app下载

News

南宫棋牌app下载

About

南宫棋牌app下载

Products

南宫棋牌app下载

Contact